0
我有一個.NET程序集在MS Dynamics AX的執行上GeneralJournal導入文件轉換的超時時間2012如何延長斧頭入境轉型
Occaisionally我發現了一個錯誤報告了與超時(看起來像一個WCF錯誤)
我無法在端口設置中看到配置任何超時設置的位置。
有人知道嗎?
The request failed with the following error:
This request operation sent to net.tcp://SERVERNAME/DynamicsAx/Services/GeneralJournalPayroll
did not receive a reply within the configured timeout (00:05:00).
The time allotted to this operation may have been a portion of a longer timeout.
This may be because the service is still processing the operation or because the service
was unable to send a reply message. Please consider increasing the operation timeout
(by casting the channel/proxy to IContextChannel and setting the OperationTimeout property)
and ensure that the service is able to connect to the client.
有關這方面的消息嗎?還可以按照錯誤中的說明設置OperationTimeout? – Rod